1300 565 995 info@ccdgroup.com.au

Contractors in renewable energy and pipeline construction are benefiting from the AS150 Backfill Conveyor with its accuracy of placement of material in bedding and backfill operations. With minimal wastage of material combined with backfilling at up to 2.5km/h this has increased productivity and greatly reduced operating costs traditionally associated with backfill operations.